Sign In | Join Free | My himfr.com
Home > Three Phase Pad Mounted Transformer >

3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V

    Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers
     
    Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers
    • Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers
    • Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers
    • Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers
    • Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers
    • Buy cheap 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V from wholesalers

    3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V

    Ask Lasest Price
    Brand Name : WINLEY
    Model Number : S-3500/15
    Certification : UL,CE,ISO
    Price : $5000-$150000
    Payment Terms : T/T
    Supply Ability : 1000set/month
    Delivery Time : 30days
    • Product Details
    • Company Profile

    3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V

    2500Kva 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV to 480V


    A padmount or pad-mounted transformer is a ground mounted electric power distribution transformer in a locked steel cabinet mounted on a concrete pad. Since all energized connection points are securely enclosed in a grounded metal housing, a padmount transformer can be installed in places that do not have room for a fenced enclosure.



    Main data


    specification data
    No.ParticularsUnitSpecification
    1Type~pad mounted, loop feed
    2Rated capacitykVA3750
    3No. of Phase~3
    4Primary voltageV13800, Delta
    5Primary bushing~600A bushing
    6Secondary voltageV480Y/277
    10Cooling method~ONAN
    11Rated frequencyHz60
    12Vector group~Dyn1
    13Insulation class~A
    14Temperature riseK65
    15Off-load lossW3610
    16On-load loss (75)W27300
    17Impedance%7.5
    18Winding material~copper or aluminum
    19Core material~silicon steel
    20Cooling materialmineral oil
    21Housing material~304 stainless steel
    22Housing color~munsell green
    23Service condition~indoor or outdoor
    24Sea levelM≤1000
    25Standard~ASNI

    Feature


    • 60 Hz operation.
    • 65°C average winding rise.
    • Radial & loop feed arrangements.
    • Dead and live front type of HV terminals.
    • HV BIL 45 – 150 kV (Dead Front) 200 kV (Live Front).
    • LV BIL 30 – 60 kV.
    • Three-point latching of low-voltage door.
    • High-voltage door, which can be opened only after
    the low-voltage door is opened.
    • Rigid steel partition.
    • Transformer tank welded from cover to base.
    • Permanent nameplate.
    • One-inch NPT pipe cap filling provision.
    • ANSI tank ground pads.
    • One-inch drain valve and sampler.
    • Automatic pressure-relief valve (35 SCFM).
    • Tap changer with (2) 2.5% full capacity taps above
    and below nominal.
    • One 10”x18” (or 14”x25”) hand hole in transformer
    tank cover.
    • Painted olive-green color (Munsell 7GY 3.29/1.5).
    • Designed, manufactured and tested in accordance
    with the latest ANSI standards


    Specification


    Rated Power (KVA)High Voltage (KV)Low Voltage (V)Loss (W)
    No-load Loss (W)On-load Loss (W)
    75KVA24.94/14.4kV
    12.47/7.2kV
    34.5KV/
    19.92KV/
    13.8KV/
    13.2KV/
    or others
    120/240V
    480Y/
    277V
    600Y/
    347V
    1801250
    112.5KVA2001500
    150KVA2802200
    225KVA4003050
    300KVA4803650
    500KVA6805100
    750KVA9807500
    1000KVA115010300
    1500KVA164014500
    2000KVA216020645
    2500KVA268023786
    3000KVA330025300
    3750KVA412527875
    5000KVA520030000

    Technical drawings

    150KVA Three Phase Pad Mount electrical Transformer Oil Immersed 13.8KV 3

    Production process


    150KVA Three Phase Pad Mount electrical Transformer Oil Immersed 13.8KV 4

    150KVA Three Phase Pad Mount electrical Transformer Oil Immersed 13.8KV 5

    150KVA Three Phase Pad Mount electrical Transformer Oil Immersed 13.8KV 6


    3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V


    FAQ


    1. Q: Can I have a sample order?

    A: Yes, we welcome sample order to test and check quality.

    2. Q: What is the lead time?

    A: Mass production time 15-25 days.

    3. Q: How long is the warranty?

    A: 24 monthes from B/L. If there are any accessory problems,just provide the photos of damaged accessory,then we will provide free service. According to the number of products,we will provide easily damaged accessories for free. we also can provide technical support if you need.

    4. Q: Is OEM/ODM available?

    A: Yes,it is! We are manufacturer with our own R&D team, we can customize products according to customer's drawing or requirements.

    Customized services:

    a. Customized color and special function.

    b. Customized box.

    c. Print customer's logo.

    d. Your other ideas about product, we can help you design and put them into production. The above customized services must be confirmed before production.

    5. Q: How to control the products quality?

    A: Our company owns the core technology ,all kinds of products hold CE certificate. We have professional engineers. Workers are strictly required to make products according to the drawings. Each process has technical instructors.The QC supervisors will regularly inspect the production. We will do products performance tests during production, and comprehensive quality tests when the products is completed.

    Quality 3750 Kva Three Phase Pad Mounted Transformer Step Down 13.8KV To 480V for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Xiamen Winley Electric Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)